A. SPATIAL DEVELOPMENT
- Spatial Framework of Sterea Ellada Region
- Spatial Impact Assessment of European Funds between 1996 - 2003 in the Region of Sterea Ellada.
- Drafting of "STRATEGIC PLAN FOR LAMIA AS A PILOT APPLICATION FOR MEDIUM-SIZED EUROPEAN CITIES" and support for social dialogue procedures. Contracting agency: Municipality of Lamia / European Commission D.G.XVI.
- Study for the upgrading of a special zone called "POLYTOPO" at the archaeological site and the historical city of Ierapetra (pop: 12,000). Specifically: Reclamation of old salt-marsh area, and creation of an interior lagoon area and multiple-use recreation areas. Contracting agency: Municipality of Ierapetra, 1993.
- General guidelines for integrated development of housing areas in the prefectures of Evia and Fthiotida. Contracting agency: Ministry of the Environment, Planning and Public Works, 1999 (still in progress).
- Local spatial plans for the Municipalities of Argos, Thebes, Lamia, Archanes etc.
B. URBAN PLANNING
- Town planning study and implementation study for the area of summer residences in the Municipality of Kalyvia (on the south-east coast of Attica). Contracting agency: Ministry of the Environment, Planning and Public Works, 1994 (still in progress).
- Urban renewal in central areas (Article 13) and expansion of the town of Kiato (implementation study). Contracting agency: Municipality of Kiato, 1993.
- Town planning, organization and implementation study for the coastline in the region of Eastern Rethymnon, Crete. Contracting agency: Community of Adele, 1995 (still in progress).
- Town planning and implementation study for the Municipality of Gazi, Heraklion, Crete. Contracting agency: Ministry of the Environment, Planning and Public Works, 1996 (still in progress).
C. URBAN ENVIRONMENT UPGRADING AND MANAGEMENT
- Urban environment upgrading programme for the Municipality of Aghios Dimitrios, Attica. Contracting agency: Municipality of Aghios Dimitrios, Attica, 1990.Traffic arrangements for the Municipality of Aghios Dimitrios, Attica, involving the construction of extensive pedestrianized areas and cycle-lanes. Preparation of selectable recommendation for the EU LIFE Programme, 1992.
- Implementation study for the construction of a pedestrianized area, cycle-lanes and parking area in the Aghios Dimitrios shopping centre ( 1.5 km), involving the preservation of public traffic facilities (implementation in operation). Municipality of Aghios Dimitrios, Attica, 1993.
- Three-year inter-state pilot programme for RECITE I (1992-1994) on "Strategic Upgrading of the Built Urban Environment in the Centre of Lamia" on behalf of the city of Lamia, network-leader for eight European cities with populations of between 50,000 and 200,000 residents.
More specifically the programme comprised:
- Comparative study for city centre development in four European medium-sized cities ( Lamia, Roskilde, Zwole, Charleroi).
- Land use reorganization study, using a G.I.S. for viable city centre management adjusted to the requirements of the network's medium-sized cities.
- Proposal for the minization of car-use, coordination of traffic and urban planning.
- Proposal for modernization of the infrastructure network.
- Office organization and implementation programme.
Contracting agency: Municipality of Lamia / EU's D.G.XVI, within the framework of RECITE I, 1992-1994.
4. Special planning study for the upgrading of the Municipality of Kallithea, Attica (pop: 180,000) by increasing public utility areas, and alternative proposal for mild forms of parking. Contracting agency: Municipality of Kallithea, 1991.
5. Urban renewal and rehabilitation of public areas at Lofos Sikelias in Kallithea. Contracting agency: Municipality of Kallithea, 1993.
6. Upgrading of coastline ( 4 km) at Kiato (pop: 12,000) through a combination of planning regulations and implementation of combined traffic arrangements and construction of pedestrianized and parking areas. The application is currently in operation. Contracting agency: Municipality of Kiato, 1992.
D. IMPACT ASSESSMENT
- Environmental impact of the Athens Metro on the built environment. Special Consultant to NAMA S.A., Athens Metro S.A., 1994.
- Environmental Impact Assessment Study of road network upgrading works in the prefecture of Trikala. Contracting agency: Ministry of the Environment, Planning and Public Works, 1995.
- Environmental Impact Assessment Study of upgrading works on the regional Atalanti-Fthiotida highway, 1995.
- Spatial analysis support for the Environmental Impact Assessment Study on the construction of the pedestrianized section of the "Unification of Athens Archaeological Sites" project, 1998.
- Spatial impact of EU development policies on the Central Region of Greece.
E. CONSULTATION SERVICES TO EU PROGRAMMES
- Management consultant to the Lamia Municipal Enterprise for Local Publicity Organization for the interstate programme RECITE, 1992-1994: "Strategic Upgrading of the Built Urban Environment in the Centre of Lamia".
- Management consultant to the interstate European Cities MECINE network, 1995.
- Consultant to the Prefecture of Lasithi, Crete, regarding participation in LEADER II, TERRA AND INFORMATION SOCIETY programmes (network organization and programme development).
F. HOUSING
- Preliminary study for housing development at the "Thessaliko Horio" [ Thessaly Village], a self-financing seaside housing complex for expatriate Greeks, covering an area of 10 hectares. Comprehensive package including the sales policy for the final housing product. Public Planning & Housing Corporation (DEPOS), 1998.
- General direction of design and management policies for Public Planning & Housing Corporation projects; two large housing developments for the Corporation, including:
- The " Arcadian Village", a holiday-home complex for Greek expatriates on the Repondina peninsula in Arcadia (300 housing units, 200 plots and a 100-bed hotel with full technical and social infrastructure). State Planning & Housing Corporation, 1989.
- The only building expansion organized in post-World War II Greece, in the town of Kalamitsa, near Kavala ( 206 hectares, of which 76 were delivered for use during 1987-1989, as plots with full infrastructure). State Planning & Housing Corporation, 1989.
|